ROBERT BLAIS - Québec, Canada

These pictures show the degree of work done as of December 2005. 

More work has been done since...

The fuselage and cabin section is rivited and approximately 75% finished.

The last fuselage skin will be riveted when all the control cables are installed.

The sticks are installed.

This tricycle Tundra will be flying soon...The wings installation is also completed, with the fuel tanks intalled and connected, the control cables connected and the wing tips installed.

The instrument panel is completed  and will be installed in the airplane next week (June 12, 2006).

Finally, the cabin floor panel needs to be riveted.

 

If everything goes as planned... and if progress continues at this rate... Airventure controllers should hear;  Oshkosh Approach, this is Canadian Foxtrot India November Xray,
inbound for landing Oshkosh...   : )

 

PICTURES OF THE FLIGHT TO SUN N FUN... TO COME...

ON OUR WAY TO FLORIDA

 

THE TAIL WHEEL AND THE TRICYCLE AT SUN N FUN

This is the Tricycle before OSHKOSH

And Finaly on our way to AIRVENTURE

Go back to the build reports list